Cantilever formwork system of timberworking beam

Cantilever formwork pj200 system

Updated:2019-11-01

 

                                                              【Cantilever formwork pj200 system】

1、The cantilever formwork pj200 is mainly suitable for the concrete pouring of different structures such as piers, dams, concrete retaining walls, cooling towers, high-rise buildings, etc. it is suitable for high-altitude operation without additional scaffolding.

2、The biggest advantage of pj200 frame is its light weight and convenient application. Each part of the main body can be disassembled or assembled freely. The distance between the components of two frame bodies is not more than 3m, the pouring height can reach 6m, and the formwork part can be moved back 600mm as a whole. The front and back inclinations can be adjusted by the support frame up and down, left and right, and the use is flexible; the maximum angle is ± 18 °

3、The side pressure of concrete is completely borne by embedded parts and through wall bolts. The construction of the system is simple, rapid, and very economical. The concrete surface quality is good. It is an ideal single-sided wall formwork system.

4、The formwork units are connected by the core belt, and the units are connected in a straight line. The connectors are highly standardized, versatile, fast in construction, low in cost and high in repeated use.

5、The adjustment device can be used for the formwork to make it close to the concrete to prevent leakage of grout and misplacement.

6、The frame system is equipped with a lifting point platform to facilitate the removal of embedded parts and the appearance treatment of concrete.

 

13717890889华湄悬臂模板.jpg

华湄-悬臂模板13717890889.jpg

华湄 悬臂模板13717890889.jpg

悬臂模板13717890889.jpg

华湄悬臂 模板13717890889.jpg

华湄 悬臂模板-13717890889.jpg

 

Copyright © Beijing Huamei World Trade Technology Development Co., Ltd. All rights reserved Beijing ICP Preparation 09086139 110112000260