Case

Xinzhou building, Shanghai

Updated:2018-12-05

照片 411_副本.jpg 

2_副本_副本.jpg  20160312_143342_副本.jpg

 

The leakage concrete surface of this project is mirror fair-faced concrete, and the inclined wall has an inclination angle of about 70 degrees. It is difficult for the formwork to support, position, reinforce and resist the floating of the formwork. How to insert and pull out the vibrating rammer and ensure that it will not break the surface of the clear-water formwork during the construction is also the difficulty of this project. How to ensure that all the bubbles at the bottom of the roof concrete turn over and concrete pouring does not produce bubbles, honeycombs and hemp surfaces is the difficulty of formwork construction; scaffolding erection, due to the inclined walls and slants, the scaffolding of this project not only bears the gravity of supporting formwork and concrete, but also resists lateral thrust, for the overall scaffolding. Stiffness and stability are also the difficulties of this project.

 

 照片 088_副本.jpg   上海新洲大厦_副本_副本.jpg


Project Name: Caohe Jingxinzhou Building Industrial Workshop Project

Used Products: Steel Frame Wood Mould System, Scaffold Support System

Year: 2015



Copyright © Beijing Huamei World Trade Technology Development Co., Ltd. All rights reserved Beijing ICP Preparation 09086139 110112000260